International Journal of Engineering، جلد ۳۸، شماره ۱۰، صفحات ۲۲۳۱-۲۲۴۸

عنوان فارسی
چکیده فارسی مقاله
کلیدواژه‌های فارسی مقاله

عنوان انگلیسی A Combined Approach to Enhance Risk Management in Building Information Modelling in Iran's Construction Industry
چکیده انگلیسی مقاله Along with the emergence of new technologies in recent years, risks and uncertainties have become more complex. Although Building Information Modelling (BIM) is a promising method in the construction industry that can mitigate numerous risks, it also introduces new risks as an innovative technology. Therefore, improving risk management through BIM for the construction works is of great importance. The present study utilized a four-stage combined approach for this purpose. Initially, the most significant risks in BIM implementation in the construction industry were identified. Subsequently, the causal relationships among the risks were identified using the DEMATEL method, and the importance of each risk was determined using the Analytic Network Process (ANP). Finally, a mathematical model was developed to allocate responses to the risks, and the mathematical model was solved using the Invasive Weed Optimization (IWO) and Grey Wolf Optimizer (GWO) algorithms. The analysis revealed that the objective function value obtained through the Grey Wolf Optimizer method was consistently more favourable compared to the Invasive Weed Optimization method. Ultimately, the findings indicated that the proposed approach serves as a powerful tool for project managers to assess risks and predict appropriate responses for the risks of BIM implementation.
کلیدواژه‌های انگلیسی مقاله Building Information Modelling,Risk Management,invasive weed optimization,Grey wolf optimizer

نویسندگان مقاله A. Naderi |
Department of Civil Engineering, Arak Branch, Islamic Azad University, Arak, Iran

M. Ehsanifar |
Department of Industrial Engineering, Arak Branch, Islamic Azad University, Arak, Iran

E. Zeighami |
Department of Civil Engineering, Arak Branch, Islamic Azad University, Arak, Iran

M. Mirhosseini |
Department of Civil Engineering, Arak Branch, Islamic Azad University, Arak, Iran


نشانی اینترنتی https://www.ije.ir/article_208292_6349b36f5a9a3ce1582ca5a46b05abda.pdf
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات