|
International Journal of Industrial Engineering and Productional Research-، جلد ۲۹، شماره ۳، صفحات ۰-۰
|
|
|
عنوان فارسی |
|
|
چکیده فارسی مقاله |
|
|
کلیدواژههای فارسی مقاله |
|
|
عنوان انگلیسی |
Bi-Criteria Robotic Cell Scheduling and Operation Allocation in the Presence of Break-downs |
|
چکیده انگلیسی مقاله |
This paper focused on scheduling problems arising in a two-machine, identical parts robotic cell configured in a flow shop. Through current research, a mathematical programming model on minimizing cycle time as well operational cost, considering availability of robotic cell as a constraint, is proposed to search for the optimum allocation and schedule of operations to these two machines. Two solution procedures, including weighted sum method and ∊-constraint method are provided. Based on the weighted sum method, like some previous studies, sensitivity analysis on model parameters were done and the optimum solutions were compared with previous results, while the ∊-constraint method can find the Pareto optimal solutions for problems with up to 18 operations in a reasonable time. |
|
کلیدواژههای انگلیسی مقاله |
|
|
نویسندگان مقاله |
| Bahareh Vaisi School of Industrial Engineering South Tehran Branch, Islamic Azad University, Tehran, Iran
| Hiwa Farughi Department of Engineering, University of Kurdistan, Sanandaj, Iran
| Sadigh Raissi School of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran
|
|
نشانی اینترنتی |
http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-609-2&slc_lang=en&sid=1 |
فایل مقاله |
دریافت فایل مقاله |
کد مقاله (doi) |
|
زبان مقاله منتشر شده |
en |
موضوعات مقاله منتشر شده |
و موضوعات مربوط |
نوع مقاله منتشر شده |
پژوهشی |
|
|
برگشت به:
صفحه اول پایگاه |
نسخه مرتبط |
نشریه مرتبط |
فهرست نشریات
|