این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
Iranian Journal of Numerical Analysis and Optimization، جلد ۱۱، شماره ۲، صفحات ۴۰۱-۴۰۵

عنوان فارسی
چکیده فارسی مقاله
کلیدواژه‌های فارسی مقاله

عنوان انگلیسی Investigating a claim about resource complexity measure
چکیده انگلیسی مقاله The utilization factor (UF) measures the ratio of the total resources’ amount required to the availability of resources’ amount during the life cycle of a project. In 1982, in the journal of Management Science, Kurtulus and Davis claimed that “If two resource-constrained problems for each type of resource have the same UF’s value in each period of time, then each problem is subjected to the same amount of delay provided that the same sequencing rule is used (If different tie-breaking rules are used, a different schedule may be obtained)”. In this paper, with a counterexample, we show that the claim of authors cannot be justified.
کلیدواژه‌های انگلیسی مقاله Scheduling scheme, Priority rule, Multi-project environment, Resource measure

نویسندگان مقاله H.R. Yousefzadeh |
Department of Mathematics, Payame Noor University (PNU), P.O. Box, 19395-4697, Tehran, Iran.


نشانی اینترنتی https://ijnao.um.ac.ir/article_40312_8214282b691a326eca997c011264a241.pdf
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات