این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
International Journal of Industrial Engineering and Productional Research-، جلد ۳۲، شماره ۱، صفحات ۳۷-۴۵

عنوان فارسی
چکیده فارسی مقاله
کلیدواژه‌های فارسی مقاله

عنوان انگلیسی A Simulation Optimization Approach for The Multi-Objective Multi-Mode Resource Constraint Project Scheduling Problem
چکیده انگلیسی مقاله According to the real projects' data, activity durations are affected by numerous parameters. In this research, we have developed a multi-resource multi objective multi-mode resource constrained scheduling problem with stochastic durations where the mean and the standard deviation of activity durations are related to the mode in which each activity is performed. The objective functions of model were to minimize the net present value and makespan of the project. A simulation-based optimization approach was used to handle the problem with several stochastic events. This feature helped us to find several solutions quickly while there was no need to take simplification assumptions. To test the efficiency of the proposed algorithm, several test problems were taken from the PSPLIB directory and solved. The results show the efficiency of the proposed algorithm both in quality of the solutions and the speed.
کلیدواژه‌های انگلیسی مقاله Simulation-based Optimization,Resource constraints Project scheduling,Multi-objective,Multi-modes.

نویسندگان مقاله | Parham Azimi
Department of Industrial and Mechanical Engineering, Qazvin Islamic Azad University


| Shahed Sholekar
Qazvin Islamic Azad University



نشانی اینترنتی http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-630-3&slc_lang=en&sid=1
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده مدل های شبیه سازی و احتمالی
نوع مقاله منتشر شده پژوهشی
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات