|
International Journal of Engineering، جلد ۲۳، شماره ۳، صفحات ۲۳۵-۲۵۲
|
|
|
عنوان فارسی |
|
|
چکیده فارسی مقاله |
|
|
کلیدواژههای فارسی مقاله |
|
|
عنوان انگلیسی |
A HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL |
|
چکیده انگلیسی مقاله |
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genetic algorithm (GA) is proposed and hybridized by four priority dispatching rules. Different scheduling problems are generated at random and solved by both mathematical programming model and the proposed hybrid GA. The related results illustrate that this proposed algorithm performs well in terms of the efficiency and quality of the solutions. |
|
کلیدواژههای انگلیسی مقاله |
|
|
نویسندگان مقاله |
Reza Tavakkoli-Moghaddam | Industrial Engineering, University of Tehran
|
|
نشانی اینترنتی |
http://www.ije.ir/article_71865_bd75ddfbd3cf9f40fb09539fc3513250.pdf |
فایل مقاله |
اشکال در دسترسی به فایل - ./files/site1/rds_journals/409/article-409-2422111.pdf |
کد مقاله (doi) |
|
زبان مقاله منتشر شده |
en |
موضوعات مقاله منتشر شده |
|
نوع مقاله منتشر شده |
|
|
|
برگشت به:
صفحه اول پایگاه |
نسخه مرتبط |
نشریه مرتبط |
فهرست نشریات
|