این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
International Journal of Industrial Engineering and Productional Research-، جلد ۱۸، شماره ۳، صفحات ۷-۱۸

عنوان فارسی
چکیده فارسی مقاله
کلیدواژه‌های فارسی مقاله

عنوان انگلیسی A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
چکیده انگلیسی مقاله Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, the amount of continuous crashing, and a start time for each activity so that all constraints are obeyed and the project duration is minimized. Project scheduling of this type occurs in many fields for instance, predicting the resources and duration of activities in software development projects. A key feature of the model is that none of the typical models can cope with the continuous resource constraints. Computational results with a set of 100 generated instances have been reported and the efficiency of the proposed model has been analyzed.
کلیدواژه‌های انگلیسی مقاله

نویسندگان مقاله سید محمد سیدحسینی | s m seyed hosseini


m سبزه پرور | m. sabzehparvar


s نوری | s. nouri



نشانی اینترنتی http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-1-25&slc_lang=en&sid=en
فایل مقاله دریافت فایل مقاله
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده Material Managment
نوع مقاله منتشر شده پژوهشی
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات