|
International Journal of Industrial Engineering and Productional Research-، جلد ۲۰، شماره ۱، صفحات ۱-۱۰
|
|
|
عنوان فارسی |
|
|
چکیده فارسی مقاله |
|
|
کلیدواژههای فارسی مقاله |
|
|
عنوان انگلیسی |
The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups |
|
چکیده انگلیسی مقاله |
The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic method to solve the problem in sequence dependent case. Furthermore, a genetic algorithm has been developed which applies this constructive heuristic to generate initial population. These two proposed solution methods are compared on randomly generated problems. Computational results show a clear superiority of our proposed GA for majority of the test problems. |
|
کلیدواژههای انگلیسی مقاله |
|
|
نویسندگان مقاله |
m حیدر |
b کریمی |
سید علی ترابی | s a
|
|
نشانی اینترنتی |
http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-1-42&slc_lang=en&sid=en |
فایل مقاله |
فایلی برای مقاله ذخیره نشده است |
کد مقاله (doi) |
|
زبان مقاله منتشر شده |
en |
موضوعات مقاله منتشر شده |
و موضوعات مربوط |
نوع مقاله منتشر شده |
پژوهشی |
|
|
برگشت به:
صفحه اول پایگاه |
نسخه مرتبط |
نشریه مرتبط |
فهرست نشریات
|